Blog
16 November 2026
Field notes: the pad site that penciled until the drainage easement showed upA pad site deal that worked on paper until a drainage easement turned up in title. Notes on what we should have checked earlier.
16 November 2026
How to tell a strip center from a power center in satellite imageryRoof footprint, parking field size and pad count read differently for strip, neighborhood and power centers. Here's what to look for before the site visit.
9 November 2026
How to measure site frontage from satellite imageryA field guide to estimating road frontage from current satellite imagery before you order a survey, plus how frontage and depth should shape your shortlist.
9 November 2026
Build-to line vs. setback: why a pad site can't sit just anywhere on its lotA build-to line pulls a building toward the street instead of pushing it back. Here's how it differs from a setback and what it does to your site plan.
2 November 2026
Field notes: the lot that looked flat on the aerial and wasn'tA site selection field note on how a clean, flat-looking aerial hid a berm, a drainage cut, and a gravel lay-down yard until someone finally drove out.
2 November 2026
Corner lot or inline: reading a parcel in satellite imageryHow to tell a corner lot from an inline lot in satellite imagery, with the frontage, curb-cut, and parking tells that settle it before a site visit.
26 October 2026
How to estimate trailer parking stalls on an industrial site from satellite imageryA practical method for counting trailer stalls and staging capacity on a candidate industrial site using high-resolution satellite imagery.
26 October 2026
What is a reciprocal parking agreement, and why it matters for a pad siteWhat a reciprocal parking agreement covers for a pad site, why REAs and built parking counts drift apart, and what to check before an LOI.
19 October 2026
Field notes: the parking lot that told us more than the broker package didA site selection manager's field notes on a candidate pad site where the overhead image caught what the broker package left out.
19 October 2026
How to spot a shared access easement in satellite imageryWhat cross-access easements look like from above, and where imagery stops short of the title report when you're scouting a retail or industrial parcel.
14 October 2026
How to shortlist candidate sites before you spend your site visit budgetA desktop screening pass that cuts a long candidate list down before anyone books a flight or drives three hours to look at a parcel.
14 October 2026
What counts as surrounding activity when profiling a siteWhat belongs in the surrounding-activity line of a site profile: parking lot fill, co-tenancy, loading activity, and what to leave out.
13 October 2026
What is a cross-dock facility, and how do you spot one from overhead imagery?How to tell a cross-dock facility from a single-loaded distribution building by reading dock door placement and truck court layout in satellite imagery.
13 October 2026
What a visibility triangle is, and why your retail entrance depends on itA plain explanation of visibility triangles, sight distance at a driveway, and why corner lot entrance clearance can sink a retail site before it opens.
8 October 2026
How to count parking spaces from satellite imageryA field-tested method for counting parking spaces from aerial imagery, plus what drives accuracy up or down on a real site profile.
8 October 2026
How to spot a pad site or outparcel in a shopping center aerial viewHow to tell a pad site or outparcel apart from anchor and inline space in a shopping center aerial view, by footprint, parking and access cuts.
8 October 2026
What counts as adequate ingress and egress for a retail siteA site selection manager's breakdown of curb cut counts, access points and the frontage details that make or break a retail pad.
8 October 2026
What is a curb cut, and why it matters for site accessA curb cut is the driveway opening in a street curb, and it can decide whether a retail or industrial site even works. Here's what shapes the permit.